{"id":287952,"date":"2023-11-24T16:57:48","date_gmt":"2023-11-24T16:57:48","guid":{"rendered":"https:\/\/project.co\/?p=287952"},"modified":"2024-11-01T16:30:44","modified_gmt":"2024-11-01T16:30:44","slug":"scope-creep","status":"publish","type":"post","link":"https:\/\/project.co\/scope-creep\/","title":{"rendered":"What is Scope Creep? (Causes, Examples + Tips for Avoiding it!)"},"content":{"rendered":"<div id=\"bsf_rt_marker\"><\/div>\n<p>Scope creep is defined as<em> \u2018the uncontrolled extension to product or project scope without adjustments to time, cost and resources.\u2019<\/em> <\/p>\n\n\n\n<p>It remains a constant menace to project managers everywhere! Unchecked, scope creep can cause projects to go over budget, miss deadlines, and result in lower quality work.<\/p>\n\n\n\n<p>In extreme cases scope creep can lead to projects being scrapped altogether &#8211; and nobody wants that! <\/p>\n\n\n\n<p>So in this guide, we&#8217;ll discuss what scope creep is, what causes it, and how to avoid it. We&#8217;ll also provide some helpful tips you can use to make sure your next project stays on track!<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What is scope creep in project management?<\/strong><\/h2>\n\n\n\n<p>&#8216;Scope creep&#8217; is a term that&#8217;s tossed around in <a href=\"https:\/\/project.co\/project-management-terms\/\">project management<\/a> circles all the time. If you&#8217;re feeling out of the loop, allow us to catch you up. <\/p>\n\n\n\n<p>When we talk about the scope of a project, we\u2019re basically talking about things like:<\/p>\n\n\n<div class=\"lazyblock-blank-purple-1l9gt1 wp-block-lazyblock-blank-purple\"><div class=\"pdc-block blank-purple\" style=\"background:#301151; border:5px solid rgba(255,255,255,0.4); padding:20px; border-radius:10px; margin-bottom:1.4em; color:rgba(255,255,255,1)\">\n  &#8211; <strong>Deliverables: <\/strong>What we\u2019re making, building or creating.\u00a0<br>&#8211; <strong>Resources: <\/strong>Who\u2019s going to be making, building or creating it, and what materials\/tools do they need?<br>&#8211; <strong>Timelines: <\/strong>How long it\u2019s going to take, when each stage of the project is due for completion, and when the final deliverable(s) will be delivered.<br>&#8211; <strong>Budget:<\/strong> How much it\u2019s going to cost, and how much the end-client is paying.\n<\/div><\/div>\n\n\n<p>Scope <strong><em>creep<\/em><\/strong> then, is when the scope of a project &#8211; all the things we mentioned above, plus potentially some others &#8211; starts to expand<em><strong> beyond<\/strong><\/em> what was originally agreed upon.&nbsp;<\/p>\n\n\n\n<p>Whoever invented the term \u2018scope creep\u2019 did a great job &#8211; because it hints at the minute, insidious nature of it.&nbsp;Scope creep is sneaky! It rarely presents as something obviously transformative. It generally looks like a little tweak here or there &#8211; but that little tweak can create huge knock-on effects, like the proverbial butterfly effect.<\/p>\n\n\n\n<p>Anyway, for now, let\u2019s just say that scope creep can be a big problem in project management: it can lead to projects going over budget, missing deadlines, and delivering lower quality work.<\/p>\n\n\n\n<p>And, as we\u2019ve already mentioned, in extreme cases, scope creep can even cause projects to be scrapped entirely!<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What causes scope creep<\/strong>?<\/h2>\n\n\n\n<p>There are a few different things that can cause scope creep.&nbsp;<\/p>\n\n\n\n<p>Perhaps the most common cause is a change in direction from stakeholders.<\/p>\n\n\n\n<p>Stakeholders are the people who have a vested interest in the project &#8211; usually, they&#8217;re the ones who will be using or benefiting from the end product.<\/p>\n\n\n\n<p>They might change their mind about what they want from the project, or ask for additional features that weren&#8217;t part of the original scope.<\/p>\n\n\n\n<p>The problem is that relatively modest changes to the project scope can create huge knock-on effects in terms of additional changes, extra resources, extra work and increased costs.&nbsp;<\/p>\n\n\n\n<p>Another common cause of scope creep is simply unforeseen circumstances &#8211; and this can be much trickier to navigate because you don\u2019t see it coming.<\/p>\n\n\n\n<p>This could be anything from bad weather delaying construction work, to a supplier not being able to deliver materials on time.<\/p>\n\n\n\n<p>Sometimes, scope creep can even be caused by the project team itself!<\/p>\n\n\n\n<p>For example, if the team underestimates how long it will take to complete a task, that can lead to scope creep &#8211; because, suddenly, the timelines of a project are disrupted, which comes with a host of implications around cost and project viability.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Real world examples of scope creep<\/strong><\/h2>\n\n\n\n<p>Here are some examples of what scope creep might look like in the real world. We&#8217;ve put together some different scenarios from different industries:<\/p>\n\n\n<div class=\"lazyblock-blank-purple-Z1aOyur wp-block-lazyblock-blank-purple\"><div class=\"pdc-block blank-purple\" style=\"background:#301151; border:5px solid rgba(255,255,255,0.4); padding:20px; border-radius:10px; margin-bottom:1.4em; color:rgba(255,255,255,1)\">\n  &#8211; A project manager is asked to add an additional feature to a website that&#8217;s already in development.<br>&#8211; A construction company is asked to add an extra room to a house that&#8217;s already being built.<br>&#8211; A software development team is asked to add a new module to a software application that&#8217;s already in development.<br>&#8211; A restaurant customer communicates, while his order is in the kitchen, that he actually wants his steak \u2018rare\u2019 instead of \u2018well done.\u2019\n<\/div><\/div>\n\n\n<p>In any of these cases, you can see the problems.&nbsp;<\/p>\n\n\n\n<p>Extra work needs to be done in terms of planning.<\/p>\n\n\n\n<p>Extra materials are required.<\/p>\n\n\n\n<p>Some materials already used, and work already done, are suddenly rendered redundant.<\/p>\n\n\n\n<p>Of course, these changes may all be possible &#8211; but there are sure to be considerations in terms of the budget and timelines that need to be accommodated and factored in.&nbsp;<\/p>\n\n\n\n<p>Just going ahead and accepting \u2018creep\u2019 without fully considering and addressing <em>every <\/em>implication and making sure everything still adds up, is the clearest path to loss, damage and failure!<\/p>\n\n\n<div class=\"lazyblock-article-GXulM wp-block-lazyblock-article\"><div style=\"color:#666666; font-size:16px; font-weight:bold; padding-left: 20px; margin-bottom:5px;\">\n  <i class=\"fa-solid fa-file-lines\" style=\"margin-right:5px\"><\/i>Recommended Article\n<\/div>\n<div style=\"background:#eeeeee; padding:20px; border-radius:10px; margin-bottom:1.4em; display:flex;\">\n  <div class=\"recommended-article-featured-holder\" style=\"margin-right:15px;\">\n    <div><a href=\"https:\/\/project.co\/project-failure\/\"><img decoding=\"async\" src=\"https:\/\/project.co\/wp-content\/uploads\/2024\/06\/Project-Failure.png\" alt=\"\" \/><\/a><\/div>\n  <\/div>\n  <div>\n    <div style=\"margin-bottom:5px;\"><a href=\"https:\/\/project.co\/project-failure\/\" style=\"font-weight:bold; color:#333333; font-size: 20px; font-family: 'Inter',Tahoma,Helvetica,Arial,sans-serif;\">Project Failure: 12 Reasons Why Projects Fail (+Solutions)<\/a><\/div>\n    <div style=\"color:#666666;\">Project failure is common. But with the tips and tricks in this article, hopefully you can manage your project successfully to avoid common mistakes.<\/div>\n  <\/div>\n<\/div><\/div>\n\n\n<h2 class=\"wp-block-heading\"><strong>How big a problem is scope creep?<\/strong><\/h2>\n\n\n\n<p>Unfortunately, scope creep isn\u2019t a rare thing. It\u2019s a huge problem &#8211; and it&#8217;s actually only getting bigger.<\/p>\n\n\n<div class=\"lazyblock-statistic-ZTBbxJ wp-block-lazyblock-statistic\"><div style=\"color:#301151; font-size:16px; font-weight:bold; padding-left: 20px; margin-bottom:5px;\">\n  <i class=\"fa-solid fa-chart-mixed\" style=\"margin-right:5px\"><\/i>Statistic\n<\/div>\n<div style=\"background:#301151; border:5px solid rgba(255,255,255,0.4); padding:20px; border-radius:10px; margin-bottom:1.4em; color:rgba(255,255,255,1);\">\n  <strong>37%<\/strong> of project failures are the result of a lack of<em> \u2018clearly defined objectives and milestones to measure progress\u2019<\/em> &#8211; making this the <strong>single biggest cause <\/strong>of project failure.<br>And <strong>49%<\/strong> of completed projects <em>&#8216;experience scope creep or uncontrolled changes to the project&#8217;s scope.&#8217;<\/em>\n  <div style=\"margin-top:5px; font-size:14px;\">\n    <strong>Source: <\/strong><a href=\"https:\/\/www.pmi.org\/-\/media\/pmi\/documents\/public\/pdf\/learning\/thought-leadership\/pulse\/pulse-of-the-profession-2017.pdf\" style=\"text-decoration: underline; color:rgba(255,255,255,1);\">Project Management Institute<\/a>\n  <\/div>\n<\/div><\/div>\n\n\n<p>It&#8217;s not just small projects that are affected &#8211; even large, complex projects can fall victim to scope creep.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How to avoid scope creep<\/strong><\/h2>\n\n\n\n<p>Now that we&#8217;ve talked about what scope creep is and some of the things that can cause it, let&#8217;s take a look at how you can avoid it.<\/p>\n\n\n\n<p>Here are a few tips:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. <strong>Properly define scope<\/strong><\/h3>\n\n\n\n<p>It sounds basic but if things aren\u2019t clearly defined in the early stages of a project, the door is left wide open to scope creep.<\/p>\n\n\n\n<p>Get crystal clear about those things we mentioned earlier on: <strong>deliverables, resources, timelines, budgets.<\/strong><\/p>\n\n\n\n<p>What <strong>EXACTLY <\/strong>are you creating?&nbsp;<\/p>\n\n\n\n<p>Who exactly is doing it, and with what materials? How long will it take? When will it be delivered? How much will it cost?&nbsp;<\/p>\n\n\n\n<p>Make sure you have a detailed project plan that outlines all of this and is clearly understood by everybody involved. There should be zero room for vagueness or misinterpretation here.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. <strong>Communicate scope properly<\/strong><\/h3>\n\n\n\n<p>Get buy-in from all stakeholders <em>before <\/em>starting work on the project. It can be annoying to hold back on starting work while these things are discussed and understood, but &#8211; compared to the potential damage of leaving things ambiguous &#8211; it\u2019s well worthwhile.<\/p>\n\n\n\n<p>After all, it helps to ensure that everyone is on the same page and there are no surprises later on.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. <strong>Put processes in place for change management<\/strong><\/h3>\n\n\n\n<p>It\u2019s always good to ask the question \u2018What if?\u2019&nbsp;<\/p>\n\n\n\n<p>Your answer to this question forms the basis of your process around what\u2019s sometimes called \u2018change management.\u2019&nbsp;<\/p>\n\n\n\n<p>Essentially, this is your process for dealing with changes that DO pop up.<\/p>\n\n\n\n<p>Most projects are far less linear than having \u2018one\u2019 stakeholder calling all the shots. There are generally a small group of people making decisions and they\u2019ll have their own political dynamic.<\/p>\n\n\n\n<p>A change management process will help you and your team understand, if changes are requested, what\u2019s the process for putting these in place, who needs to be involved in the discussions and who needs to sign it off?<\/p>\n\n\n\n<p>This will help to ensure that any changes to the scope are agreed upon by all stakeholders before they&#8217;re implemented &#8211; and all considerations are duly made before rushing headlong into changing things.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. <strong>Close monitoring and collaboration<\/strong><\/h3>\n\n\n\n<p>There\u2019s no substitute for monitoring a project closely as it progresses. This will help you to identify any potential scope creep early on and take steps to prevent it.&nbsp;<\/p>\n\n\n\n<p>Using a project management tool like <a href=\"https:\/\/project.co\">Project.co<\/a>, gives you access to powerful task views. You can get instant visibility and clarity over who\u2019s working on what, which deliverables are due, and where the bottlenecks\/delays are.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1439\" height=\"891\" src=\"https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Visibility-Tasks-Kanban2.png\" alt=\"Kanban View\" class=\"wp-image-290638\" srcset=\"https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Visibility-Tasks-Kanban2.png 1439w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Visibility-Tasks-Kanban2-300x186.png 300w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Visibility-Tasks-Kanban2-150x93.png 150w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Visibility-Tasks-Kanban2-768x476.png 768w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Visibility-Tasks-Kanban2-400x248.png 400w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Visibility-Tasks-Kanban2-1080x669.png 1080w\" sizes=\"(max-width: 1439px) 100vw, 1439px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">5. <strong>Avoid communication silos\u00a0<\/strong><\/h3>\n\n\n\n<p>Again, most projects involve multiple people.&nbsp;<\/p>\n\n\n\n<p>This typically means multiple streams of conversation &#8211; which, without any malicious intent, can unfortunately create HUGE problems.<\/p>\n\n\n\n<p>After all, it\u2019s innocent enough to discuss some project details by email. but the problem is, this discussion is hidden from view of the rest of your team.<\/p>\n\n\n\n<p>That\u2019s why it\u2019s a good idea to keep communication out in the open, in a dedicated place, accessible to everyone who needs it. This means changes can be fully understood and addressed, and referred back to when necessary in understanding the changing scope of a project.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1854\" height=\"1100\" src=\"https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Tool-Discussion.png\" alt=\"\" class=\"wp-image-290681\" srcset=\"https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Tool-Discussion.png 1854w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Tool-Discussion-300x178.png 300w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Tool-Discussion-150x89.png 150w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Tool-Discussion-768x456.png 768w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Tool-Discussion-1536x911.png 1536w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Tool-Discussion-400x237.png 400w, https:\/\/project.co\/wp-content\/uploads\/2024\/02\/Tool-Discussion-1080x641.png 1080w\" sizes=\"(max-width: 1854px) 100vw, 1854px\" \/><\/figure>\n\n\n<div class=\"lazyblock-article-Jnptu wp-block-lazyblock-article\"><div style=\"color:#666666; font-size:16px; font-weight:bold; padding-left: 20px; margin-bottom:5px;\">\n  <i class=\"fa-solid fa-file-lines\" style=\"margin-right:5px\"><\/i>Recommended Article\n<\/div>\n<div style=\"background:#eeeeee; padding:20px; border-radius:10px; margin-bottom:1.4em; display:flex;\">\n  <div class=\"recommended-article-featured-holder\" style=\"margin-right:15px;\">\n    <div><a href=\"https:\/\/project.co\/project-communication-plan\/\"><img decoding=\"async\" src=\"https:\/\/project.co\/wp-content\/uploads\/2024\/06\/Project-communication-plan-why-you-need-one.and-how-to-write-it.png\" alt=\"\" \/><\/a><\/div>\n  <\/div>\n  <div>\n    <div style=\"margin-bottom:5px;\"><a href=\"https:\/\/project.co\/project-communication-plan\/\" style=\"font-weight:bold; color:#333333; font-size: 20px; font-family: 'Inter',Tahoma,Helvetica,Arial,sans-serif;\">Project Communication Plan: Why You Need One &amp;amp; How to Create It<\/a><\/div>\n    <div style=\"color:#666666;\">When communication breaks down, costly and time-consuming mistakes can happen. So find out how to create a project communication plan in just a few steps.<\/div>\n  <\/div>\n<\/div><\/div>\n\n\n<h3 class=\"wp-block-heading\">6. <strong>Be prepared to say no<\/strong><\/h3>\n\n\n\n<p>Not the most technical advice but \u2018No\u2019 is often the magic word when it comes to business and that\u2019s definitely the case in avoiding scope creep.<\/p>\n\n\n\n<p>It can be difficult, but sometimes you need to stand your ground and say \u2018<em>no way, Jose<\/em>\u2019 to changes that would cause scope creep.<\/p>\n\n\n\n<p>If you\u2019re not a \u2018no\u2019 person, then at the very least, you need to master your \u2018<em>Yes, but\u2026<\/em>\u2019<\/p>\n\n\n\n<p>This is often the most effective way to manage scope creep when you\u2019re delivering a service.<\/p>\n\n\n\n<p>When faced with a request from a client that would change the scope of a project, you can reply\u2026<\/p>\n\n\n\n<p>\u2018<em>Yes, we could do that, but it would mean\u2026<\/em>\u2019<\/p>\n\n\n\n<p>Follow this up with your honest interpretation of what said change would lead to. It might result in going back to an earlier stage of the process, it may incur additional costs, it might take longer &#8211; maybe it\u2019s all 3 of those things.&nbsp;<\/p>\n\n\n\n<p>But, in any case, when you empower your client or stakeholder to make an educated decision, you\u2019ll often find they see the value in sticking to the original project scope, which makes the problem go away!<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Final thoughts<\/strong><\/h2>\n\n\n\n<p>So, there you have it.<\/p>\n\n\n\n<p>Scope creep can be a huge problem for project managers, resulting in projects running late, missing the mark or going over budget.<\/p>\n\n\n\n<p>There\u2019s no silver bullet for dealing with it &#8211; but keeping your eyes open, understanding exactly what it is, and being alive to the issues caused by tweaks and changes, will give you the best possible chance of avoiding scope creep and keeping your project on track!<\/p>\n\n\n\n<p><strong>Since you\u2019re here, why not check out our <\/strong><a href=\"https:\/\/project.co\/\"><strong>project management tool<\/strong><\/a><strong>? We built Project.co because we thought the world needed a simple, powerful, easy-to-use project management tool that doesn\u2019t need a huge amount of training and onboarding!<\/strong><\/p>\n\n\n\n<p><strong>It\u2019s totally free to get started so why not check it out today!<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Scope creep can be a huge problem for project managers. Here, we discuss what it is, what causes it, and how to avoid it.<\/p>\n","protected":false},"author":6,"featured_media":287953,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[13],"tags":[],"class_list":["post-287952","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-productivity"],"jetpack_featured_media_url":"https:\/\/project.co\/wp-content\/uploads\/2022\/06\/scope-creep.png","jetpack_shortlink":"https:\/\/wp.me\/pgGBe0-1cUo","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/project.co\/wp-json\/wp\/v2\/posts\/287952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/project.co\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/project.co\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/project.co\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/project.co\/wp-json\/wp\/v2\/comments?post=287952"}],"version-history":[{"count":0,"href":"https:\/\/project.co\/wp-json\/wp\/v2\/posts\/287952\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/project.co\/wp-json\/wp\/v2\/media\/287953"}],"wp:attachment":[{"href":"https:\/\/project.co\/wp-json\/wp\/v2\/media?parent=287952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/project.co\/wp-json\/wp\/v2\/categories?post=287952"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/project.co\/wp-json\/wp\/v2\/tags?post=287952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}